Food Processing Equipment Supply & Upgrade Algeria (2025)

Adwarded Budget: $295,000.00
Budget: *
Timeline: 2025
Client: Confidential
Project: Supply and upgrade of food processing equipment

Case Study

Supply, Installation and Commissioning of a Continuous Olive Processing Plant – Jijel, Algeria

Introduction

Rapanelli, through its engineering and procurement expertise, successfully delivered a complete continuous olive processing plant with a capacity of 24 tons/day input, located in Jijel, Algeria.
The project encompassed the entire scope of work, from feasibility studies and engineering design to supply, installation, commissioning, and training of local operators.

This initiative aimed to enhance local olive oil production capacity while ensuring technology transfer and long-term sustainability for Algerian producers.

Project Scope

The supply included a state-of-the-art continuous extraction line, designed to guarantee maximum efficiency and oil quality. The project development involved several key phases:

  • Feasibility Study & Engineering Design
  • Supply of Machinery and Equipment
  • On-site Installation and Commissioning
  • Training Program for Local Operators

Training Program

One of the most important aspects of the project was the on-site training delivered directly to the Algerian end-users.
The training was structured to ensure that the operators acquired both technical skills and practical know-how:

  1. Classroom Training (theory):
    • Process flow and machine operating principles
    • Preventive maintenance procedures
    • Safety guidelines and best practices
  1. On-site Practical Training (hands-on):
    • Step-by-step operation of the continuous plant
    • Real-time supervision during production runs
    • Troubleshooting and problem-solving exercises

This training ensured that the Algerian operators could independently run and maintain the plant, guaranteeing long-term operational reliability.

Implementation

The project was executed in close cooperation with local stakeholders, with Rapanelli coordinating every step of the supply chain and installation process.
The continuous plant was commissioned and fully tested on-site, with Algerian operators actively involved throughout the start-up phase.

Results

  • Plant successfully installed and commissioned in Jijel, Algeria
  • 24 tons/day input capacity achieved, increasing local olive oil production
  • Local operators fully trained, ensuring autonomy in operations and maintenance
  • Enhanced technology transfer and capacity building in the olive oil sector

Conclusion

This project demonstrates Rapanelli’s ability to deliver end-to-end industrial solutions, integrating engineering, supply, commissioning, and training.

By combining advanced technology with on-site knowledge transfer, Rapanelli ensured not only the operational start-up of the plant, but also the creation of local expertise to sustain production in the long term.

The successful completion of the Jijel project strengthens Rapanelli’s role as a reliable partner in the olive oil industry across North Africa.